COMPONENTS
REPLACEMENT
DRAIN ENGINE COOLANT
w/ Perfomance rod: REMOVE FRONT SUSPENSION UPPER BRACE CENTER
a. Remove the 2 nuts and upper brace.
3. REMOVE V−BANK COVER SUB−ASSY
Using a socket hexagon wrench 5, remove the 3 nuts.
Remove the V−bank cover.
Remove V-bank cover sub-assy
4. REMOVE AIR CLEANER CAP SUB−ASSY
Disconnet the MAF meter connector.
Disconnect the VSV connector.
Remove the ventilation hose No. 2.
Disconnect the emission tube No. 1 fuel hose.
Disconnec the vacuum hoses.
Remove the fuel vapor feed hose from the 2 hose clamps.
Loosen the air cleaner hose clamp bolt, and then remove the intake air resonator.
5. REMOVE THROTTLE BODY ASSY
Disconnect the throttle control motor & throttle position connector.
Disconnect the water bypass hose No. 2.
Disconnect the water bypass hose No. 3.
Remove the 2 bolts, 2 nuts and throttle body.
Remove the gasket.
6. INSTALL THROTTLE BODY ASSY
Install a new gasket to the intake air connector.
Install the throttle body with the 2 bolts and 2 nuts.
Torque: 11 N·m (112 kgf·cm, 8 ft·lbf)
Connect the water bypass hose No. 3.
Connect the water bypass hose No. 2.
Connect the throttle control motor & throttle position connector.
7. INSTALL AIR CLEANER CAP SUB−ASSY
Install the air cleaner hose (w/ air cleaner cap) to the throttle body.
Tighten the air cleaner hose clamp bolt.
Install the fuel vapor feed hose to the 2 hose clamps.
Connect the vacuum hoses.
Connect the emission tube No. 1 fuel hose.
Install the ventilation hose No. 2.
Connect the VSV connector.
Connect the MAF meter connector.
ADD ENGINE COOLANT
CHECK FOR ENGINE COOLANT LEAKS
NSTALL V−BANK COVER SUB−ASSY
Fit the 2 retainers and install the V−bank cover.
Using a socket hexagon wrench 5, tighten the 3 nuts.
Torque: 7.9 N·m (81 kgf·cm, 70 in.·lbf)
11. w/ Performance Rod: INSTALL FRONT SUSPENSION UPPER BRACE CENTER
a. Install the upper brace with the 2 nuts.
Torque: 80 N·m (815 kgf·cm, 59 ft·lbf)